Open a decision below. Check the area, period, inputs, result and proposed next step.

2. Try the inputs

Use Change example to try different values. Use Data needed to check the fields and sources. The land-use change decision has its own comparison views.

Record your corrections below, then download your answers or print them.

3. Check each decision

1. Prepare evidence-based seasonal water requestsDEC-DP32-003 · Irrigation requests
Try this decision

Prepare a crop-stage water-needs scenario for the stated member area.

Verified published component · Crop evapotranspiration ETc component

Fictional default example · 2025.

Fictional case / areaGross daily irrigation requirement [m³/day]Net field requirement [mm/day]Next check
Laggala Pallegama — irrigation requests / 20256,687.55.35Review weather, crop, water-availability and operating evidence
Rattota — irrigation requests / 20256,687.55.35Review weather, crop, water-availability and operating evidence
Panvila — irrigation requests / 20256,687.55.35Review weather, crop, water-availability and operating evidence

What the selected record shows. Gross daily irrigation requirement: 6,687.5 m³/day.

Next step. Review weather, crop, water-availability and operating evidence. Prepare water-needs scenario in the prototype creates a visible, downloadable draft. It is unassigned and not sent.

Calculated demand does not establish water availability or authorise a release.

Inputs, method and sources
Supplied inputValueUnit
Irrigated crop area85ha
Reference evapotranspiration4.5mm/day
Crop coefficient1.1ratio
Rainfall reaching the field after runoff1.6mm/day
Deep percolation and paddy allowance2mm/day
Capillary contribution0mm/day
Desired change in stored soil water0mm/day
Field application efficiency0.68fraction

ETc = ETo × Kc. Net = max(0, ETc + percolation + desired storage increase − rainfall after runoff − capillary contribution). Gross = net × hectares ×10 / application efficiency.

The full local balance, rooting depth, stress, crop stage and operating constraints still matter. The paddy allowance is explicit and must be zero where inapplicable. This is not an authorized reservoir release.

Other required records: Crop areas; growth stages; rainfall; soil water; percolation; efficiency.

Food and Agriculture Organization of the United Nations · FAO Irrigation and Drainage Paper 56 Crop Evapotranspiration
Institution publication · Chapter 5, Crop coefficient approach, equation 56

This verifies the ETc component only. Local water-balance allowances, coefficients and operating decisions still need confirmation.

Calculation appendix

  • FAO 56: crop evapotranspiration — Institution publication. FAO 56 Chapter 5 equation 56; ETc = Kc × ETo. Institutional context; does not establish the calculation or local approval.
  • FAO56 root-zone water balance — Institution publication. Chapter8 equation85 and ETc = Kc ETo. Daily water balance components; local coefficients and operating assumptions still need review.
  • FAO Irrigation Water Management Training Manual 3 — Institution publication. Chapter 4.4 Irrigation water need of rice; steps 1 to 8. Institutional context; does not establish the calculation or local approval.
  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Your checks for this decision
2. Escalate overdue collective farming requestsDEC-DP32-004 · Service coordination
Try this decision

Identify collective farming requests past their response date.

Validation required

Fictional default example · 2025.

Fictional case / areaOpen days past due [days]Calendar age [days]Next check
Laggala Pallegama — service coordination / 20252990Follow up overdue case; confirm the missing condition evidence
Rattota — service coordination / 20252990Follow up overdue case; confirm the missing condition evidence
Panvila — service coordination / 20252990Follow up overdue case; confirm the missing condition evidence

What the selected record shows. Open days past due: 29 days. Follow up overdue case.

Next step. Follow up overdue case; confirm the missing condition evidence. Prepare evidence request in the prototype creates a visible, downloadable draft. It is unassigned and not sent.

Information still needed
  • Documented critical unresolved condition: Unknown

Age alone does not establish eligibility or need.

Inputs, method and sources
Supplied inputValueUnit
Received or defect observed2025-04-01
Recorded due date2025-06-01
Assessment date2025-06-30
Case/work closedNo
Documented critical unresolved conditionUnknown
Responsible office or maintainerProposed responsible office
Actual closure date when closedNot provided

Open age = assessment date − received date. Days past due = max(0, assessment date − recorded due date) for open cases. Show documented critical conditions separately.

Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone.

Other required records: Request; institution; receipt; due date; response; responsible coordinator.

Calculation appendix

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Your checks for this decision
3. Propose workable water rotations for member areasDEC-DP32-005 · Water rotations
Try this decision

Check proposed water-rotation dates, effort and dependencies.

Validation required

Fictional default example · 2025.

Fictional case / areaPlanned duration [days]Resource hours remaining [hours]Next check
Laggala Pallegama — water rotations / 202538Resolve overlapping resource bookings
Rattota — water rotations / 202538Resolve overlapping resource bookings
Panvila — water rotations / 202538Resolve overlapping resource bookings

What the selected record shows. Planned duration: 3 days. Resolve overlapping resource bookings.

Next step. Resolve overlapping resource bookings. Prepare schedule review in the prototype creates a visible, downloadable draft. It is unassigned and not sent.

A schedule does not establish hydraulic feasibility, agreement or release authority.

Inputs, method and sources
Supplied inputValueUnit
Required resourceWatershed field team
Task start2025-06-01
Task end2025-06-04
Earliest permitted start2025-05-28
Latest permitted finish2025-06-08
Required resource effort16hours
Available resource effort24hours
Predecessor task referenceNone
Mandatory permits and prerequisitesMet

Check start/end order, operating window, effort, predecessor completion and overlapping bookings for the same resource. A conflict is flagged; no optimal schedule is invented.

Other required records: Approved allocation; outlet capacity; crop stage; delivery windows; member agreement.

Calculation appendix

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Your checks for this decision
4. Investigate unequal delivery against agreed allocationsDEC-DP32-006 · Tail-end equity
Try this decision

Compare documented water delivery with the same agreed allocation and period.

Validation required

Fictional default example · 2025.

Fictional case / areaDifference [m³]Relative change [%]Next check
Laggala Pallegama — tail-end equity / 2025-10-10Check the matching records and reasons for the difference
Rattota — tail-end equity / 202555Check the matching records and reasons for the difference
Panvila — tail-end equity / 2025-2-2Check the matching records and reasons for the difference

What the selected record shows. Difference: -10 m³.

Next step. Check the matching records and reasons for the difference. Prepare difference review in the prototype creates a visible, downloadable draft. It is unassigned and not sent.

A difference does not establish unfairness or its cause.

Example chart
Difference — fictional 2025 examples
Inputs, method and sources
Supplied inputValueUnit
Planned value100m³
Observed value90m³

Observed value minus Planned value. Relative change = 100 × difference / Planned value when the earlier value is positive.

Other required records: Outlet; location; agreed water; actual delivery; hectares; season.

Calculation appendix

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Your checks for this decision
5. Plan joint input purchases against verified member demandDEC-DP32-007 · Collective inputs
Try this decision

Check usable input stocks, commitments and matching expected receipts.

Validation required

Fictional default example · 2025.

Fictional case / areaUncommitted usable stock [kg input]Additional demand gap [kg input]Next check
Laggala Pallegama — collective inputs / 2025310190Review replenishment gap
Rattota — collective inputs / 2025310190Review replenishment gap
Panvila — collective inputs / 2025310190Review replenishment gap

What the selected record shows. Uncommitted usable stock: 310 kg input. Review replenishment gap.

Next step. Review replenishment gap. Prepare stock review in the prototype creates a visible, downloadable draft. It is unassigned and not sent.

Quantity alone does not establish quality, delivery certainty or a purchase authority.

Inputs, method and sources
Supplied inputValueUnit
Physical stock1,200kg input
Quarantined stock100kg input
Expired stock50kg input
Committed usable stock740kg input
Additional demand500kg input
Supplier lead time14days
Remaining shelf life of usable stock30days

Usable = physical−quarantined−expired (non-overlapping groups). Available = usable−commitments. Additional gap = max(0, new demand−available).

Stock must be compatible by item, lot, condition, expiry and delivery window. Do not allocate quarantined/expired stock or silently erase overcommitment.

Other required records: Input specification; demand; current stock; supplier lead time; commitments; expiry.

Calculation appendix

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Your checks for this decision
6. Allocate shared machinery without conflicting reservationsDEC-DP32-009 · Machinery sharing
Try this decision

Check machinery bookings against resources, effort and predecessor tasks.

Validation required

Fictional default example · 2025.

Fictional case / areaPlanned duration [days]Resource hours remaining [hours]Next check
Laggala Pallegama — machinery sharing / 202538Resolve overlapping resource bookings
Rattota — machinery sharing / 202538Resolve overlapping resource bookings
Panvila — machinery sharing / 202538Resolve overlapping resource bookings

What the selected record shows. Planned duration: 3 days. Resolve overlapping resource bookings.

Next step. Resolve overlapping resource bookings. Prepare schedule review in the prototype creates a visible, downloadable draft. It is unassigned and not sent.

The example does not reserve a machine or appoint an operator.

Inputs, method and sources
Supplied inputValueUnit
Required resourceWatershed field team
Task start2025-06-01
Task end2025-06-04
Earliest permitted start2025-05-28
Latest permitted finish2025-06-08
Required resource effort16hours
Available resource effort24hours
Predecessor task referenceNone
Mandatory permits and prerequisitesMet

Check start/end order, operating window, effort, predecessor completion and overlapping bookings for the same resource. A conflict is flagged; no optimal schedule is invented.

Other required records: Equipment; condition; member bookings; field access; operation duration; crop window.

Calculation appendix

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Your checks for this decision
7. Prioritize common tank and canal maintenance requestsDEC-DP32-010 · Irrigation upkeep
Try this decision

Identify common tank and canal repair cases past their response date.

Validation required

Fictional default example · 2025.

Fictional case / areaOpen days past due [days]Calendar age [days]Next check
Laggala Pallegama — irrigation upkeep / 20252990Follow up overdue case; confirm the missing condition evidence
Rattota — irrigation upkeep / 20252990Follow up overdue case; confirm the missing condition evidence
Panvila — irrigation upkeep / 20252990Follow up overdue case; confirm the missing condition evidence

What the selected record shows. Open days past due: 29 days. Follow up overdue case.

Next step. Follow up overdue case; confirm the missing condition evidence. Prepare evidence request in the prototype creates a visible, downloadable draft. It is unassigned and not sent.

Information still needed
  • Documented critical unresolved condition: Unknown

Age alone does not establish engineering urgency or the best repair.

Inputs, method and sources
Supplied inputValueUnit
Received or defect observed2025-04-01
Recorded due date2025-06-01
Assessment date2025-06-30
Case/work closedNo
Documented critical unresolved conditionUnknown
Responsible office or maintainerProposed responsible office
Actual closure date when closedNot provided

Open age = assessment date − received date. Days past due = max(0, assessment date − recorded due date) for open cases. Show documented critical conditions separately.

Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone.

Other required records: Asset condition; defects; command area; users affected; work options; costs.

Calculation appendix

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Your checks for this decision
8. Reconcile organization receipts expenses and balancesDEC-DP32-011 · Group finance
Try this decision

Reconcile organisation receipts, expenditure and the matching closing balance.

Validation required

Fictional default example · 2025.

Fictional case / areaCalculated closing balance [LKR]Recorded minus calculated closing [LKR]Next check
Laggala Pallegama — group finance / 2025164,000-500Reconcile closing balance
Rattota — group finance / 2025164,000-500Reconcile closing balance
Panvila — group finance / 2025164,000-500Reconcile closing balance

What the selected record shows. Calculated closing funds are 164,000 LKR. The recorded closing observation is 163,500 LKR; recorded minus calculated is -500 LKR. Check the component records before explaining that difference.

Next step. Reconcile closing balance. Prepare balance review in the prototype creates a visible, downloadable draft. It is unassigned and not sent.

A difference does not establish fraud, a legal debt or final accounts acceptance.

Inputs, method and sources
Supplied inputValueUnit
Opening cash/receivable balance160,000LKR
Receipts and documented additions48,000LKR
Payments and documented reductions35,000LKR
Other documented non-overlapping adjustments9,000LKR
Independently recorded closing balance163,500LKR

Opening + receipts/additions − payments/reductions − other documented adjustments. Compare with independently recorded closing. A negative cash scenario is a shortfall, not an invalid water volume.

Use the same physical boundary, period and units. A residual is a reconciliation issue, not automatically a measured loss.

Other required records: Opening balance; member contributions; sales; authorized spending; bank statements.

Calculation appendix

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Your checks for this decision
9. Compare collective responses to forecast water shortagesDEC-DP32-015 · Drought plans
Try this decision

Compare collective crop-calendar and rotation choices under a water shortage.

Validation required

Fictional default example · 2025.

Fictional case / areaPotential benefit · assumptionResources and adverse effectsSupporting records / conditionsNext check
Revise the agreed crop calendar / Laggala PallegamaRevise the agreed crop calendar.Needs crop-stage, forecast uncertainty, water availability and member agreement.Records: Not provided; condition evidence: Not providedObtain the missing records before choosing
Use a reduced-area crop plan / Laggala PallegamaReduce the proposed cultivated area.Needs allocation, rights, livelihood, crop and agreement evidence.Records: Not provided; condition evidence: Not providedObtain the missing records before choosing
Coordinate staged water rotations / Laggala PallegamaUse staged water rotations.Needs dependable supply, hydraulic operation, crop windows and agreement.Records: Not provided; condition evidence: Not providedObtain the missing records before choosing

What the selected record shows. There is not enough information to choose this option. Obtain the records and evidence about conditions listed below. The supplied budget less cost is 300,000 LKR.

Next step. Obtain the missing records before choosing. Prepare evidence request in the prototype creates a visible, downloadable draft. It is unassigned and not sent.

Information still needed
  • Records needed: Approved forecasts; available water; crop choices; loss estimates; member consultation
  • Applicable conditions, what was checked and the supporting reference

Cost alone does not establish crop suitability, water availability or agreement.

Inputs, method and sources
Supplied inputValueUnit
Option cost1,500,000LKR
Available budget1,800,000LKR
Mandatory constraintsMet
Potential benefit and its evidence or assumptionRevise the agreed crop calendar.
Resource needs and adverse effectsNeeds crop-stage, forecast uncertainty, water availability and member agreement.
Required records available for this optionNot provided
Reference for the required recordsNot provided
Applicable conditions, check result and supporting referenceNot provided

Compare each alternative's stated benefit, adverse effects, domain evidence and mandatory constraints. Where cost and budget are supplied, budget balance = budget − option cost. A budget balance alone does not determine domain feasibility or select an option.

Cost alone does not establish crop suitability, water availability or agreement.

Other required records: Approved forecasts; available water; crop choices; loss estimates; member consultation.

Calculation appendix

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Your checks for this decision
10. Compare collective storage and handling investmentsDEC-DP32-017 · Storage
Try this decision

Compare collective storage and handling cash flows.

Verified published formula · Discounted cash-flow NPV

Fictional default example · 2025.

Fictional case / areaFive-year net present value [LKR]Next check
Base cash-flow scenario / 2025109,847.353Review the cash flows, discount assumptions and constraints
Lower net-receipts scenario / 2025-497,196.989Review the cash flows, discount assumptions and constraints
Higher initial-cost scenario / 2025-370,152.647Review the cash flows, discount assumptions and constraints

What the selected record shows. At the supplied 8% annual discount assumption, the five-year cash flows and residual value give 109,847.353 LKR net present value after the initial investment. The figure compares cash flows under these assumptions.

Next step. Review the cash flows, discount assumptions and constraints. Prepare cash-flow comparison in the prototype creates a visible, downloadable draft. It is unassigned and not sent.

Net present value does not establish reduced losses, quality or investment authority.

Example chart
Five-year net present value — fictional 2025 examples
Inputs, method and sources
Supplied inputValueUnit
Initial investment2,400,000LKR
Net cash flow year1400,000LKR
Net cash flow year2550,000LKR
Net cash flow year3680,000LKR
Net cash flow year4720,000LKR
Net cash flow year5760,000LKR
Residual value at end of year5120,000LKR
Example discount rate8%

NPV = −initial investment + sum of year1…5 net cash flows discounted at the stated annual rate, including residual value once in year5.

Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows.

Other required records: Supply volume; losses; storage capacity; cost; market timing; finance.

Food and Agriculture Organization of the United Nations · Guidelines for defining financial economic environmental and social information
Institution publication · Sections 2.2.2 and 2.2.3, discounting and Net Present Value

The five-year horizon, discount rate and cash assumptions are local settings. Verification does not approve an investment or loan.

Calculation appendix

Your checks for this decision
11. Evaluate benefits and costs of group farming servicesDEC-DP32-020 · Collective outcomes
Try this decision

Compare recorded outcomes of group services across the supplied periods and groups.

Verified published formula · Difference-in-differences arithmetic

Fictional default example · 2025.

Fictional case / areaDifference in changes [LKR/ha]Next check
Laggala Pallegama — collective outcomes / 2025100,000Obtain the missing evidence listed below
Rattota — collective outcomes / 2025100,000Obtain the missing evidence listed below
Panvila — collective outcomes / 2025100,000Obtain the missing evidence listed below

What the selected record shows. Treatment change: 170,000; comparison change: 70,000; difference in changes: 100,000 LKR/ha. This comparison alone does not establish causation or benefit.

Next step. Obtain the missing evidence listed below. Prepare evidence request in the prototype creates a visible, downloadable draft. It is unassigned and not sent.

Information still needed
  • Study design and evidence that the treatment and comparison records are comparable

A difference in changes does not establish a causal group-service effect.

Inputs, method and sources
Supplied inputValueUnit
Treatment Member enterprise gross margin before420,000LKR/ha
Treatment Member enterprise gross margin after590,000LKR/ha
Comparison Member enterprise gross margin before390,000LKR/ha
Comparison Member enterprise gross margin after460,000LKR/ha
Study design and comparability evidenceMissing
Outcome definition, method and reference basisMember enterprise gross margin /example matching definition1

(Treatment after−before) − (comparison after−before), using the same outcome definition and periods.

The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence.

Other required records: Member baseline; service uptake; margins; follow-up; comparison; market conditions.

World Bank · Impact Evaluation in Practice Second Edition
Institution publication · Chapter 7, table 7.2, printed page 140, PDF page 170

The formula is verified. Causal interpretation still requires a defensible study design, comparison and assumptions.

Calculation appendix

  • World Bank Impact Evaluation in Practice Second Edition — Institution publication. Chapter7 difference-in-differences. Published difference-in-differences estimator and study assumptions; aggregate examples do not establish causation.
  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Your checks for this decision
12. Flag a farmers’ organization missing its annual general meetingDEC-DP32-021 · Published method
Try this decision

Source. Sri Lanka publication.

Data needed. Organization registration, year, general meeting date, notice and signed minutes.

Method. Check the annual general meeting requirement under the Agrarian Development Act and retain the meeting evidence by year.

Worked example. A farmer organization’s file has a meeting notice but no signed minutes for the year. Ask for the record that confirms the annual general meeting was held.

Next step. Request missing minutes or refer a missed meeting to the Agrarian Development Council under the applicable procedure.

Government of Sri Lanka, Agrarian Development Act No. 46 of 2000. §43(9), annual general meeting and council power after the stated period.

Confirm applicable amendments and how the council handles missed meetings.

Your checks for this decision

4. Existing data forms for your institution

Check which existing source fields can supply the decision inputs.

Irrigation Offices · Land Suitability

Existing form reference: b5701ed646f0f063

FieldUnitRequired
nameConfirm if neededNo
categoryConfirm if neededNo
district_nConfirm if neededNo
AgroEcological Zones Point · Land Suitability

Existing form reference: cc316b77dd9398f9

FieldUnitRequired
fid_1Confirm if neededNo
leftConfirm if neededNo
bottomConfirm if neededNo
rightConfirm if neededNo
topConfirm if neededNo
xConfirm if neededNo
yConfirm if neededNo
fid_2Confirm if neededNo
join_countConfirm if neededNo
target_fidConfirm if neededNo
idConfirm if neededNo
gridcodeConfirm if neededNo
final_idConfirm if neededNo
zoneConfirm if neededNo
climatic_zConfirm if neededNo
agro_eco_zConfirm if neededNo
agro_eco_rConfirm if neededNo
terrainConfirm if neededNo
major_soilConfirm if neededNo
land_useConfirm if neededNo
anualrfmmConfirm if neededNo
ASC Locations · Land Suitability

Existing form reference: a64b0a6754afd4ed

FieldUnitRequired
ASC NumberConfirm if neededNo
ASC NameConfirm if neededNo
XCOORDConfirm if neededNo
YCOORDConfirm if neededNo
Location CodeConfirm if neededNo
DescriptionConfirm if neededNo
Agro Ecological Zones · Land Suitability

Existing form reference: 592c3b578787edcd

FieldUnitRequired
ZoneConfirm if neededNo
Climatic_ZoneConfirm if neededNo
Agro_Eco_ZoneConfirm if neededNo
Agro_Eco_RConfirm if neededNo
Final_IDConfirm if neededNo
TerrainConfirm if neededNo
Major_SoilConfirm if neededNo
Land_UseConfirm if neededNo
AnualRFmmConfirm if neededNo
st_area(shape)Confirm if neededNo
st_length(shape)Confirm if neededNo
Irrigation Schemes · Land Suitability

Existing form reference: 648a6f28a711dfa9

FieldUnitRequired
System NameConfirm if neededNo
SystemsConfirm if neededNo
IDConfirm if neededNo
ID_SystemsConfirm if neededNo
MASL_SystemConfirm if neededNo
DSD_NameConfirm if neededNo
DescriptionConfirm if neededNo
st_area(shape)Confirm if neededNo
st_length(shape)Confirm if neededNo
Irrigation Lands · Land Suitability

Existing form reference: e877698582fc591c

FieldUnitRequired
Landuse TypeConfirm if neededNo
Landuse Classification (CropType)Confirm if neededNo
Creation MethodConfirm if neededNo
Year of CreationConfirm if neededNo
Revision MethodConfirm if neededNo
Year of RevisionConfirm if neededNo
GFCODEConfirm if neededNo
DescriptionConfirm if neededNo
st_area(shape)Confirm if neededNo
st_length(shape)Confirm if neededNo
Crops Suitability · Land Suitability

Existing form reference: 54fb1fe96af4f04c

FieldUnitRequired
Province NameConfirm if neededNo
Province CodeConfirm if neededNo
District NameConfirm if neededNo
District CodeConfirm if neededNo
DS Division NameConfirm if neededNo
DS Division CodeConfirm if neededNo
GND NameConfirm if neededNo
GND NumberConfirm if neededNo
MC UC PS NameConfirm if neededNo
MC UC PS CodeConfirm if neededNo
Polling Division NameConfirm if neededNo
Polling Division CodeConfirm if neededNo
idConfirm if neededNo
Area HectareConfirm if neededNo
ASC NameConfirm if neededNo
Area Sq KmConfirm if neededNo
Square KmConfirm if neededNo
Crop TypeConfirm if neededNo
st_area(shape)Confirm if neededNo
st_length(shape)Confirm if neededNo
Agrarian development divisions · Administrative & Planning Areas

Existing form reference: fc991a6c3bc249f6

FieldUnitRequired
idConfirm if neededNo
do Agrarian Development IdConfirm if neededNo
nameConfirm if neededNo
created DateConfirm if neededNo
modified DateConfirm if neededNo
cityConfirm if neededNo
latitudeConfirm if neededNo
longitudeConfirm if neededNo
District commissioner divisions · Administrative & Planning Areas

Existing form reference: 57c890c642eab82c

FieldUnitRequired
idConfirm if neededNo
district Comm IdConfirm if neededNo
nameConfirm if neededNo
do Agrarian Development DTO / idConfirm if neededNo
do Agrarian Development DTO / do Agrarian Development IdConfirm if neededNo
do Agrarian Development DTO / nameConfirm if neededNo
do Agrarian Development DTO / created DateConfirm if neededNo
do Agrarian Development DTO / modified DateConfirm if neededNo
do Agrarian Development DTO / cityConfirm if neededNo
do Agrarian Development DTO / latitudeConfirm if neededNo
do Agrarian Development DTO / longitudeConfirm if neededNo
created DateConfirm if neededNo
modified DateConfirm if neededNo
cityConfirm if neededNo
latitudeConfirm if neededNo
longitudeConfirm if neededNo
Asc divisions · Administrative & Planning Areas

Existing form reference: 0bb5ed17e5cdc863

FieldUnitRequired
idConfirm if neededNo
asc IdConfirm if neededNo
nameConfirm if neededNo
district Commissioner Level DTO / idConfirm if neededNo
district Commissioner Level DTO / district Comm IdConfirm if neededNo
district Commissioner Level DTO / nameConfirm if neededNo
district Commissioner Level DTO / do Agrarian Development DTOConfirm if neededNo
district Commissioner Level DTO / created DateConfirm if neededNo
district Commissioner Level DTO / modified DateConfirm if neededNo
district Commissioner Level DTO / cityConfirm if neededNo
district Commissioner Level DTO / latitudeConfirm if neededNo
district Commissioner Level DTO / longitudeConfirm if neededNo
created DateConfirm if neededNo
modified DateConfirm if neededNo
cityConfirm if neededNo
latitudeConfirm if neededNo
longitudeConfirm if neededNo
Paddy, OFC & VEG — 2026 Yala - April · Crop Production

Existing form reference: f2c8e1b979a467f1

FieldUnitRequired
CropConfirm if neededNo
DistrictConfirm if neededNo
MeasureConfirm if neededNo
ValuehaNo
UnitConfirm if neededNo
SeasonConfirm if neededNo
Wholesale food prices — 2026-10-28 · Markets & Value Chains

Existing form reference: 5ef25f806a9c3864

FieldUnitRequired
CommodityConfirm if neededNo
MarketConfirm if neededNo
DateConfirm if neededNo
Average priceConfirm if neededNo
UnitConfirm if neededNo
Source pageConfirm if neededNo
Wholesale food prices — 2026-10-27 · Markets & Value Chains

Existing form reference: 65fb55fc4bacaeb4

FieldUnitRequired
CommodityConfirm if neededNo
MarketConfirm if neededNo
DateConfirm if neededNo
Average priceConfirm if neededNo
UnitConfirm if neededNo
Source pageConfirm if neededNo
Wholesale food prices — 2026-10-26 · Markets & Value Chains

Existing form reference: 3d27791c0b26d5a7

FieldUnitRequired
CommodityConfirm if neededNo
MarketConfirm if neededNo
DateConfirm if neededNo
Average priceConfirm if neededNo
UnitConfirm if neededNo
Source pageConfirm if neededNo
Wholesale food prices — 2026-10-23 · Markets & Value Chains

Existing form reference: 362fe913ea87b4d5

FieldUnitRequired
CommodityConfirm if neededNo
MarketConfirm if neededNo
DateConfirm if neededNo
Average priceConfirm if neededNo
UnitConfirm if neededNo
Source pageConfirm if neededNo
Wholesale food prices — 2026-10-22 · Markets & Value Chains

Existing form reference: 4c6b93b0f4ec772d

FieldUnitRequired
CommodityConfirm if neededNo
MarketConfirm if neededNo
DateConfirm if neededNo
Average priceConfirm if neededNo
UnitConfirm if neededNo
Source pageConfirm if neededNo
Wholesale food prices — 2026-10-21 · Markets & Value Chains

Existing form reference: edf7d040b8bcbc45

FieldUnitRequired
CommodityConfirm if neededNo
MarketConfirm if neededNo
DateConfirm if neededNo
Average priceConfirm if neededNo
UnitConfirm if neededNo
Source pageConfirm if neededNo
Wholesale food prices — 2026-10-20 · Markets & Value Chains

Existing form reference: f462aa65988abf9a

FieldUnitRequired
CommodityConfirm if neededNo
MarketConfirm if neededNo
DateConfirm if neededNo
Average priceConfirm if neededNo
UnitConfirm if neededNo
Source pageConfirm if neededNo

5. Documents and images

Your institution has its own document and image library. Use the same library for reports, photos and other evidence.

Farmer Organizations Documents and images prototype screen
Farmer Organizations. Prototype screen. Select the image to enlarge it.

What you can try

  1. Open Documents and images. Check the institution name.
  2. Use All files, Documents or Images to find a file. Open its preview or download the original.
  3. Use a sample file to try Add file. Private is the starting choice. Public needs a source, permission to share and review.
  4. Use Access preview to try the institution reviewer and Public visitor views.

Files added in the prototype stay in this browser. Public sharing is an access preview. Existing public reference links already work online.

What your institution needs to confirm

6. Data structure management

Data structure keeps the existing source tree, records, charts and map. Manage structure adds a place to propose changes to definitions.

Farmer Organizations Data structure management prototype screen
Farmer Organizations. Prototype screen. Select the image to enlarge it.

What you can try

  1. Open Data structure and choose Manage structure.
  2. Use Add base domain for a main information area. Add inside creates a subject area, a nested subject, an entity type or a field under the right parent.
  3. Give the definition a clear name, code and meaning. Reuse an existing definition when the meaning is the same.
  4. For a field, check the data type, unit, required value, limits and missing-value rule. Save a Draft, then try the separate reviewer view.

An entity type means a kind of thing or event, such as a reservoir or an inspection. Drafts stay in this browser. A demo approval does not change real definitions, data, chart links or sharing rights.

What your institution needs to confirm

7. Users and access

User management shows example profiles for each institution. People and Roles and access let you review the proposed account screens.

Farmer Organizations Users and access prototype screen
Farmer Organizations. Prototype screen. Select the image to enlarge it.

What you can try

  1. Open User management and choose the institution. The rows are examples, not a list of your staff.
  2. Use View access to check a role. An administrator title alone does not give access to Private files.
  3. Try Preview invitation or Preview access change. Check the role, start date, optional end date and reason.
  4. Review the example permissions and tell us which job roles should receive each one.

These are interface previews only. They create no account, send no email and change no access. Use example details in the preview. Institution verification does not grant a real permission.

What your institution needs to confirm

8. Can you share data regularly?

We currently use public data and published reports where available. Please confirm whether your institution can provide data directly, so we can avoid retyping or reading figures from PDFs.

Do not enter passwords, access keys or private account details.

9. Anything else we should change?

Use the Download answers button at the top of this page. Share the downloaded file or printed copy through your agreed review channel. Nothing is sent automatically.