DATA → REVIEW → USEFUL ANSWERS

Start your SHARED review.

Try the prototype. Check your institution’s data, screens and proposed decisions. Use your review document to tell us what to change before development is finalised.

41 institution reviews507 active decision examples105 presentation screens

A SHORT REVIEW JOURNEY

Follow one question from start to finish.

01

See the answer

Choose your institution and a decision. Read the source or sample label, chart title, date and unit.

02

Try the inputs

Enter sample values or upload the matching template. Save a draft and try the separate reviewer view.

03

Check the result

Open the accepted chart, map or report. Check the formula and compare the result with the entered values.

04

Tell us what to change

Open your institution document below. Check the proposed decisions, required data, library, structure and access screens.

Start with Irrigation Department public data · Try the clearly marked paddy water example

About this review

This is a demonstration for client feedback and development planning. Public data keeps its source and date. Samples stay clearly marked. Test drafts, uploaded files and review answers stay in this browser and website address. User-management screens create no real accounts or permissions. The real SHARED system and its records are unchanged.

INSTITUTION VERIFICATION

Choose your institution.

Each document includes current decisions, examples, required data and questions for your team. Use very simple example data when testing.

Answers save in this browser. Use Download answers to keep a copy, or Print / Save PDF. Use Import answers to continue from a downloaded copy. Nothing is sent automatically.

Prototype checks

The mock screens cover data entry, source review, maps, decisions, project work, documents and reports. Extra business details are under More details. The coverage workbook records each requirement and its remaining checks.

Use this prototype for design review. Real sign-in, server security, external integrations, load, mobile synchronisation and restore tests belong to future service delivery.

Published methods

The active catalogue contains 466 retained decisions and 41 new examples based on published methods. View the 354 archived decisions.

See the method and source for each decision.

Review 28 Sri Lanka decision proposals.

Verified means the published formula was checked against its source. For a component, only the named part is verified. Confirm local settings and use in the list below.

Method and statusPublished sourceLocal use to confirm
USLE factor product
Verified published formula
United States Department of Agriculture Forest Service
1980 technical publication SA-TP 11; Universal Soil Loss Equation, printed page 2; metric conversion appendix, printed page 40
The historical source verifies the factor product. Local factor choice and suitability still need confirmation; this is not a full RUSLE2 implementation.
Enterprise gross margin
Verified published formula
Food and Agriculture Organization of the United Nations
Chapter 4, Gross margin and section 4.7.1
Per-hectare and variable-cost break-even outputs are algebraic rearrangements. Local costs, prices and interpretation still need confirmation.
Discounted cash-flow NPV
Verified published formula
Food and Agriculture Organization of the United Nations
Sections 2.2.2 and 2.2.3, discounting and Net Present Value
The five-year horizon, discount rate and cash assumptions are local settings. Verification does not approve an investment or loan.
Carbon stock-difference component
Verified published component
Intergovernmental Panel on Climate Change
Section 2.3.1.1, equation 2.8, stock-difference method
The screen reports the period total. IPCC annualisation requires elapsed years. Pools, inventory inputs and local application still need confirmation.
Soil-carbon stock with volume correction
Verified published formula
Intergovernmental Panel on Climate Change
Section 4.3.3.5.4, equation 4.3.3, printed page 4.106, PDF page 18
The screen converts carbon percent to a fraction and uses the published coarse-fragment volume convention. Sampling and bulk-density conventions still need confirmation.
Difference-in-differences arithmetic
Verified published formula
World Bank
Chapter 7, table 7.2, printed page 140, PDF page 170
The formula is verified. Causal interpretation still requires a defensible study design, comparison and assumptions.
Sample coefficient of variation
Verified published formula
National Institute of Standards and Technology United States
Description, sample coefficient of variation and ratio-scale restrictions
Use a meaningful zero and positive mean. Local series selection and decision limits still need confirmation.
HHI concentration component
Verified published component
United States Department of Justice
Definition and four-firm worked example
The screen uses fractional shares on a 0–1 scale, equivalent to the published percentage-share score divided by 10000. Local exposure categories and policy thresholds are not verified by this source.
Matched-pair RMSE
Verified published formula
Environment and Climate Change Canada
Displayed RMSE equation and definitions of forecast, observation and verification count
Local verification periods, observation quality and forecast applicability still need confirmation.
Binary Brier score and skill component
Verified published component
Japan Meteorological Agency
Sections A.3.1 and A.3.2, equations A.3.1 and A.3.3, printed page 239, PDF page 7
The Brier score is checked for binary events. The prototype permits a supplied reference forecast; confirm its independent baseline and comparability before interpreting skill.
Crop evapotranspiration ETc component
Verified published component
Food and Agriculture Organization of the United Nations
Chapter 5, Crop coefficient approach, equation 56
This verifies the ETc component only. Local water-balance allowances, coefficients and operating decisions still need confirmation.
Weighted estimation component
Verified published component
United Nations Statistics Division
Chapter 9, paragraphs 38 and 39, printed page 9-9, PDF page 417; Chapter 8 weighting
Local weights, population coverage, design variance and ratio-yield interpretation still need confirmation. Positive illustrative weights do not demonstrate every calibration design.
IWA water-balance components
Verified published component
Asian Development Bank
Figure 4, printed page 15; Annex 1 Water Balance Definitions, printed pages 39–41, PDF pages 47–49
Apparent-loss estimates and the residual real-loss estimate remain local inputs with measurement uncertainty.

Dataset pairs

Review the proposed source pairs, sample matches and missing data for each institution. Open dataset pairs

Data needed from institutions

Use this list to follow up on the 41 draft dataset pairs.

Data ownerWhat to provide
Department of Export AgricultureProvide the 2025 district and crop figures for the 100 affected entries. Give crop extent in hectares and production in metric tonnes, or explain the blank. Both figures are blank for 81 entries. Only production is blank for 19.
2025 extent table · 2025 production table
Southern Province Ministry of AgricultureProvide the missing March and April Yala 2026 cultivation progress in hectares, or explain the blank, for the 79 affected crop and district entries in Galle, Matara and Hambantota. Confirm that April row 54 is Wing bean.
March CropIX report · April CropIX report
Irrigation DepartmentProvide the Alikota Ara effective storage reading for 1 April 2025 in acre-feet, or confirm why the Yala series leaves it blank.
Yala reservoir series
Export Development BoardProvide the combined fish and fisheries share of merchandise exports and the total merchandise exports used to calculate it. We need the 10 full years from 2016 to 2025 and January to September 2026. Include the basis for the published figures.
Export Performance Report

Already explained by the source

Data ownerWhat the source explains
Forest Department / Department of Census and StatisticsThe six 2024 forest-class figures are in the newer edition. The earlier edition ends in 2023, so a comparison between editions uses 2019–2023. The six 2024 figures need no new data.
Earlier Table 5.29 · Newer Table 5.29
Department of MeteorologyKatunayake’s 17:30 observation on 10 November 2026 records TRACE for rainfall since 08:30. Keep the trace as reported. Request the original station record only if a numeric amount is needed.
Department observations · Saved review record
Department of Census and StatisticsJaffna had no paddy cultivation in Yala 2023 or Yala 2024, so average yield does not apply. This explains four entries across the Department of Agriculture and Farmer Organizations dataset pairs. No new yield figures are needed.
Table 5.20, note 1

Download the row-by-row gap list · Review the dataset pairs

Client and expert decisions

These decisions remain pending in Institution review. Each decision should state what was checked, who checked it, the outcome and any conditions. One review can cover the same method used by several screens.

TopicWhat to confirmWho
Scope and institutions
C01, C02, C12
Confirm the final features, proposed decisions, participating institutions and what stays in existing tools.Client
Responsibilities
C02
Name who owns data, submits records, reviews them and approves sharing.Client and institutions
Maps and boundaries
C03
Source studies report 1,533 and 1,584 GN divisions. Which dated programme roster, official codes and boundary edition apply? Who maintains them? SRS geographic rules. The dated rosters and crosswalk are needed.Data custodian and GIS expert
Data sources
C04
Confirm datasets, fields, units, update frequency and access or sharing conditions.Source institutions
Privacy
C05
Confirm access to personal records, sensitive locations and retention periods.Client and privacy specialist
New or changed calculations
E01
Review proposed scores, weights, thresholds, missing-value rules and method changes. For published methods, confirm local inputs, units, settings and intended use.Relevant expert or statistician
Land soil and water methods
E02
Confirm local suitability, sampling, laboratory methods and model factors.Relevant domain experts
Ecosystem services and PES
E03
Confirm eligibility, rights, rates, safeguards, verification and payment authority.Client and relevant experts
Indicators and payments
C10
Confirm indicator definitions, acceptance measures, milestones and payment weights.Client and monitoring or finance specialists
Languages and access needs
C06
Confirm wording, supported devices and accessibility requirements.Client and representative users
Technical choices and service targets
C07, C08
Agree architecture, hosting, operator, costs, performance, security and recovery targets.Client and technical adviser
Complaints and appeals
C09
Confirm receiving officers, response times and the appeal process.Client
Final SRS acceptance
C11
Confirm consultation comments, agreed revisions, validation, final presentation and final acceptance.Authorized client representative

Live-system security, load and recovery tests belong to implementation. The SRS needs agreed requirements and a test plan. No separate expert approval is needed for each mock screen or repeated calculation.

Source details to confirm

LUPPD: the alternative publications provide planning context. The applicable local planning procedure still needs confirmation under C04 and E02.

HARTI: the published prices support the quoted observations. They do not automatically support proposed volatility, spread or other analysis; review these under C04 and E01.

Download the confirmation list

ONE SET OF REVIEW MATERIALS

Prepare the development brief.

Keep agreed changes with the institution review answers and the development brief. A working sample or screen image alone is not evidence that a live service, scientific method or access rule has been approved.